Dubai World Central is a 140 square kilometer, multi- phase development with the world’s biggest airport, DWC-Al Maktoum International Airport, at its core.
Fully self-sustaining, Dubai World Central promises to be a key benchmark in the evolution of the emirate, a genuine city- within-a-city. DWC creates a new benchmark in urban planning and destination living designed to support Dubai’s aviation, tourism, commercial and logistics requirements until 2050 and beyond, and represents one of the most important developments in the history of the United Arab Emirates.
In perspective, the total dedicated land area is almost twice the size of Hong Kong Island and expected to have an ultimate population of 945,000 people working and living within its borders.
The master plan is composed of six inter-related mini-cities; each carefully planned to satisfy good quality living and work environment, through integrated high quality living standards, while contributing to DWC’s functional organizational structure. DWC golf city.
DWC-Al Maktoum International Airport
DWC Aviation City
Dubai Logistics City (DLC)
DWC Residential City
DWC Commercial City, and
DWC Golf City
Significant features
Integration of diverse ELV systems into a management level network and real time analyses of data to attain significant cost reduction year on year
Multi entity integration of device eco-systems from diverse protocols with the proprietary enterprise city management framework “Galaxy” to deliver real time controlling of entire airport infrastructure The projected outcome is a city hin the airport which will be managed by a command and control centre with seamless communication capabilities.
Concept Architecture
ROI opportunities
User Interface
Concept Architecture
Integration: the act of combining into an integral whole
Interface : hardware or software link that links one device or system to another
Protocol : rules determining the format and transmission of data
BIS - building integration system
IS - integration system
BMS - building management system
SACS - security access control system
CCTV - closed circuit television
FAS - fire alarm system
CMS - conveying management system
HVTS - horizontal and vertical transportation system
PMU - power management units
UPS - static uninterruptible power unit
ECBS - emergency central battery system
LCMS - lighting control and monitoring system
SCADA - supervisory control and data acquisition system
MATV - master antenna television
IASS - LOCAL integrated aircraft stand system
Airport Building ELV Systems
At C3, the world’s first Airbus A-380 dedicated facility designed for the exclusive use of Emirates Airlines, Pacific Controls takes the role of the Building Integration System where the messages from the different Airport ELV Systems are parsed, interpreted and forwarded to the destination systems in the protocol supported by those systems. The flight schedules updated by the Management Information System are forwarded to the respective ELV Systems, where operations are dependent on the schedule of the flights. BIS takes the role of a system watch dog monitoring the health status of all the connected servers and Gateways.
The integrated application on which the BIS runs is an unified platform enabling centralized monitoring and controlling through the web, a seamless environment where by data is normalized relieving the user the intricacies of different protocols from different vendors.
User Interface
Pacific Controls plan to provide a highly equipped Integrated Command Control Center solution to monitor, control and manage their assets in (24x7 days) located in Saudi. PCS shall design, install, configure and maintain the CCC for the Mobily. The focus of Pacific Controls is to promote the ICT sector in playing an important role in reducing operation cost, Energy cost and CO2 reductions. This strategy should include target based implementation of ICT services, and M2M technology in buildings and infrastructure in the gulf regions.
Mobily is looking to Revamp and update the Security and Building Management systems within their asset base in the Kingdom of Saudi Arabia through the breakthrough ICT enabled services from Pacific Controls. This is going to be achieved by integrating diverse facilities of Mobily and providing a single window solution which can be monitored and managed. The monitoring and management will take place from a Central Command and Control Center in Saudi. The different sub-systems to be integrated are Building Management System, Closed Circuit Television System, Security Access control system, Intrusion detection system, HVAC system, Lighting control system, Fire Alarm system, Power monitoring system, Communication and Media system, Metering and Billing system and Energy Management.
Pacific Controls provides the solution beyond today’s technology; our solution will improve the performance of various facilities to monitor, control and manage their assets seamlessly. The expected outcomes of this programme is that, Pacific Controls will deliver complete turnkey solution, meeting all objectives required and enabling both the organizations to develop further business together. Some of the key benefits to the client will be:
Derived from an Arabic word which when translated, describes a place where people congregate and compete- the Meydan City project nesting 4kms from the mouth of Dubai creek is founded on simple grounding principles of partnership, community and sporting excellence. The developer of the biggest equestrian sporting venue in the world, the Meydan Group develops this city which is an interconnected cityscape of four distinct districts where the worlds of business, sports and elegant living intertwines to enhance, encourage and benefit each other.
This is the third biggest project in Dubai, after the Burj Dubai and the Metro and the IBMS Monitors and Controls all the electromechanical devices in the buildings.
Concept architecture
For the initial phase of this project, the Intelligent Building Management System developed by Pacific Controls encompasses the five star hotels-The Banyan Tree with more than ten fine-dining restaurants, the 60,000 capacity Grandstand, the Car Park – a covered parking for 10,000, the Dubai Racing Club and Emirates Racing Authority offices.
Meydan Business View Dashboard Another highlight of the project is the web based interface of all the monitoring cameras of the Access Control System, whereby the user can view online any of the CCTV Cameras as a pop up. Fire Alarm Systems are also integrated to the IBMS and the devices are monitored and controlled efficiently where the life and safety of the occupants is the prime concern.
The IBMS controls all the HVAC devices for these buildings through an automated control system which could be controlled centrally through a pre defined schedule or by the user requirements locally. The control points are integrated to touch panels, thermostats etc thereby making the controls more users friendly and having more fidelity.
All of the Building systems are integrated by the Intelligent Building Management System onto a single platform thereby enabling to control and monitor all of the facilities through a common Human Machine Interface (HMI). The common IP backbone coupled with the web services offered through IBMS enables the Building system to be integrated to the Web.
Thus stunning landmark buildings, horse racing stands and luxurious residential accommodation mingle seamlessly at Meydan City resulting in a community designed to strike the perfect work-life balance where residents and employees can effortlessly move between both elements of their lives, using one to augment the other.
The data from all the field devices are collected, parsed and presented intelligently through the Graphics of IBMS, whereby the management can view all the required information through a single interface.
The IBMS controls all the HVAC devices for these buildings through an automated control system which could be controlled centrally through a pre defined schedule or by the user requirements locally. The control points are integrated to touch panels, thermostats etc thereby making the controls more users friendly and having more fidelity.
User Interface
CISCO Systems Cisco connected real estate solution from pacific controls aims at converging the building management systems across different buildings to a single unified platform, interface with any embedded device imaginable, regardless of manufacturer or communication protocol.
It models the data and behavior of the devices into normalized software components, providing a seamless, uniform view of device data to the enterprise via a variety of ip-based protocols and open API’s.
This is an ICT implementation where the IBMS, application & database servers are located remotely at the Cisco Data Center in Amsterdam and the Cisco call manager in Cisco Bahrain data center. The multi-protocol building systems communicate with these servers.
Centralized monitoring and controlling means better efficiency, performance and energy savings.
It is possible to make virtual visit to each and every system from a single location. Thus Cisco and pacific controls has joined together to produce the best solution world wide for connecting real estates.
The solution features high level multiple interactive use case/scenarios
Cisco CRE use cases/scenarios
BAS monitoring of building systems
Energy policy – BAS power monitoring
BAS lighting
CCRE policy engine
BAS fire alarm
BAS meeting rooms, IP phone controls
Concept architecture
Energy Policy
- Energy consumption
- Demand profile
- Power quality
- Carbon footprint
- Phase imbalances
- Energy analysis
- Performance analysis
- Electrical analysis
- Benchmarking
- Budgeting
- Data profiling
BAS Lighting
- Desktop widgets
- Graphical user interface
- Pdas
CCRE Policy Engine
- Lighting schedules
- Temperature set point schedules
- Global schedule
- Zonal schedules
- Floor schedules.
- Define alarm escalation
- Define alarm routing
- Route alarms using sms/email
- Manage existing user accounts
- Provide user rights
- Create new users
- View data histories over user defined periodsp
- View multiple parameters on single pagep
- Select your own chart types against each parameterp
Reports
BAS Fire Alarms
BAS Meeting Rooms, IP Phone Controls
BAS Meeting rooms
User Interface
User Interface
Al yah satellite communications company prjsc (yahsat) is a private joint stock company fully owned by Mubadala, An investment arm of the government of Abu Dhabi. Since Being incorporated in 2007, they have designed the Region’s first multi-purpose satellite system, based on Extensive interaction with customers and research into their Communication needs.
They are coming up with two satellite stations in Abu Dhabi and Al Ain. Pacific Controls are providing the complete integrated building management and security solution on Their ICT backbone.
Solution highlights:
User Interface
The Palm Monorail is the first monorail constructed in the Middle East and developed by a consortium of leading international companies led by the Marubeni corporations. The monorail is a Hitachi-based system with 5.45km fully elevated, double tracked system with four (4) stations.
Costing US $381 million (AED1.4 billion), the system - which is fully automatic and will carry up to 6,000 people per hour when running at full capacity. Four stations - Gateway Towers, Trump Tower, Trump Tower and Atlantis - plus one depot and one operations control Center have been operating for the route.
The Palm Jumeirah Monorail Stations
Solution Highlights
1. CCTV system with real time video streaming and archiving
2. Each Station having Security Cameras at Entry and Exit on each level
3. The Stations are provided with Camera Servers and Database Server
4. IP Based Camera and video streaming
5. All Stations connected through OFC backbone
6. Monitoring facility at Operational Control Room (Gateway station) and Station Control Room in all Stations
Water consumption monitoring and Management system
Solution Highlights:
1. Automated Data Collection
2. Data Representation for Monitoring
3. Data Logs for History and Trends
4. Management Tool for Water M&V Practices
5. Scalable Solution
6. System Compatible to Remote monitoring Services (Optional)
7. Compatible to Alarm Management System (Optional)
8. Compatible for Alarms Notification through SMS (Optional)
User Interface
DP World is a leading enabler of global trade and an integral part of the supply chain and operates multiple yet related businesses – from marine and inland terminals, maritime services, logistics and ancillary services to technology-driven trade solutions. DP world has 70 terminals in 31 countries across six continents with a significant presence in both high-growth and mature markets.
The Vision of DP world to bring foreseeing change and innovate aim to create the most productive, efficient, safe trade and sustainable solutions globally into every aspect of work. Pacific Controls added the value by providing SCADA, energy and critical asset real time monitoring system which enables better managing of equipment, productive, efficient and safe working atmosphere with in the terminals.
The SCADA, energy and critical asset real time monitoring system in container terminals enables the centralized monitoring and proactive assessment of critical equipment thus mitigating the down-times. The ability to drive cost savings and productivity gains at a blend of building types, substations and critical equipments such as RMG, STS cranes.
Project requirement:
Concept architecture
The project:
PCS solution:
User Interface
Concept architecture – 80 sites
PCS Solution – Value proposition to Etisalat
>> Business Impacts/Applications
There are unprecedented demands to...
Managed Services approach will...
User Interface
Building details:
Approach:
Local:
The energy saving of 10% predicted from the first of three stages was achieved as targeted
Remote:
Approach:
Plant room automation
Energy management strategies implemented
- Chillers are sequenced based on building load
- Set point reset, time scheduling and free cool mode controls implemented
- Run time equalization strategy implemented
- Applies to the chillers and chilled water pumps.
Approach:
Remote monitoring
In depth analysis of chiller performance
- Compressor and circuit performance monitoring
- Coefficient of performance
- DOE2 analysis used to identify gaps
- IPLV analysis used to identify that right number of circuits and chillers are running at the right time.
Carbon footprint
- Carbon footprint of individual equipment
- Information summary dashboards
Energy performance management
- Performance analysis such as Regression, Cusum and SEC
- Base load analysis.
- Condition based maintenance – FDD
- Extensive reporting
- Remote control and continuous commissioning of the chilled water plant.
User Interface
The Vision
In 2008, Dubai Civil Defence and Pacific Controls together embarked on a unique project to enhance life safety and national security in Dubai, United Arab Emirates, by implementing the 24x7 Direct Alarm System through a 24x7 Command Control Center. On completion of the project, every private and government building within Dubai will be monitored for fire, lift safety, and emergency alarms using state-of-the-art IOT solutions.
Pacific Controls has built a state of the art 24x7 Command Control Center to monitor the facilities around the clock where skilled staff monitors and manages the infrastructure, ensuring robustness, quality service and high uptime. Operating Procedures (SOPs) have been developed and embedded in close consultation with Dubai Civil Defence, to ensure timely integration of buildings, real time monitoring of life safety alarms and seamless sharing of useful information like building location and floor plans with operations team, for an effective and efficient operation.
In Dubai, by implementing the 24x7 Direct Alarm System for monitoring of life safety alarms, the system has achieved accurate, timely and early notification of emergencies. It supports efficient coordination of emergency services, to tackle safety situations and has not only reduced the number of life safety incidents in Dubai but also improved the response time of first responders and overall compliance.
Pacific Controls has also launched series of Dubai Life Safety Dashboards to add more power to Dubai Civil Defence operations, enhancing the organization’s capabilities to capture data for better decision-making and organizational performance. Dubai Life Safety Dashboards and Personal Dashboard is a sophisticated way to digitally track and access critical information online that allows decision makers at Civil Defence, building owners, residents and visitors to monitor the life safety status of Dubai in real time and determine their roles, responsibility and accountability in a transparent and dynamic manner. This enables significant transformation in how performance levels and safety standards can be enhanced exponentially by sharing real time information between all the stake holders to act on information and participate in a collaborative manner. The enterprise-class business intelligence delivered through the dashboard will also help all government departments, building owners and residents to monitor their buildings health and safety status in real-time on a great intuitive interface.
User Interface
World’s most modern university infrastructure has a state of the art ICT infrastructure called ICAST integrating all electro mechanical services on a single IP backbone seamlessly delivering infrastructure management, optimization, continuous commissioning, energy services, delivering carbon footprint in real time.
Features
Pacific Controls ICT network enables centralized supervisory control, monitoring and management of building subsystems across the University campus from a single user interface.
Device maintenance to enterprise services; This involved integrating a eclectic range of electro mechanical services onto a single IP backbone seamlessly delivering the services across the vast campus
A Command and Control center serves as the delivery and monitoring Key Performance Indicators (KPI) of the infrastructure to cover 24X7 facility management and safety. Given the vastness of the KAUST campus, the connectivity and the integration allows a single point contact to systems, sub-systems, their performance and status, this raises the quality and standard of its facility management program.
Buildings - Horseshoe Campus
BAS: Building Automation System
LCS: Lab Control System (GH, Nano Tech etc)
PMS: Power Monitoring System
LiCS: Lighting Control System
FDAS: Fire Detection and Alarm System
DC: Data Cube
SE: Smart Elevators
External Systems
NS: Nitrogen Storage and Distribution
ELS: External Civil Lift Stations
IRCS: Irrigation Control System
FS: Fountain Systems
CUP: Central Utility Plant
User Interface
Roads and Transport Authority (RTA), Dubai is responsible for planning and providing the requirements of transport, roads & traffic in the Emirate of Dubai, and between Dubai and other Emirates of the UAE, neighboring countries in order to provide an effective & an integrated transport system capable of achieving Dubai's vision & serving the vital interests of the Emirate.
RTA has different facilities all over the emirate of Dubai which comprises of bus depots, office buildings, Traffic control rooms, staff accommodations etc. This project involves seamless integration to the different facilities of RTA and bringing all data and information back to the Command Control Center in RTA Headquarters enabling monitoring, control, measurement and verification and energy saving measures for the various electromechanical equipments in the building.
Pacific Controls uses the state of art M2M technology for the integration to the various electromechanical equipments from different vendors in these facilities, and uses the secure RTA IP backbone to bring data back to the RTA Command and control Center.
User Interface
Pre-requisites for LEED rating Pacific Control Headquarters
1. Sustainable Site
2. Water Efficiency
3. Energy & Atmosphere
4. Materials and Resources
5. Indoor Environment Quality
6. Innovation & Design Process
1. Sustainable Site
2. Water Efficiency
3. Energy & Atmosphere
4. Materials and Resources
5. Indoor Environment Quality
6. Innovation & Design Process
Exceed requirements for green building ratings in local and regional material use and green house keeping.
Renewable Energies
Pacific Controls had accumulated a total of 55 points
The first ever accrued to date for any newly constructed building in UAE seeking LEED® platinum certification.
Re-cap : History in the making
1. IP Infrastructure
MDF
IDF
2. IP Convergence
Service Building
Enterprise Applications
User Interface